Go through this checklist before signing any contractor estimate. The best time to dispute is before you sign — 60% of disputes are resolved when raised before the contract is signed.
10–15% down payment to cover material deposits and mobilization
25% of total contract price — confirmed by walkthrough
25% — plumbing, electrical, HVAC rough-in inspected and approved
25% — drywall, paint, flooring, fixtures installed
10–15% — punch list complete, your walkthrough sign-off required
Written approval required before work begins. Never authorize verbally.