Free Checklist

Contractor Estimate Review Checklist

Go through this checklist before signing any contractor estimate. The best time to dispute is before you sign — 60% of disputes are resolved when raised before the contract is signed.

Project Start

10–15% down payment to cover material deposits and mobilization

Demo / Framing Complete

25% of total contract price — confirmed by walkthrough

Rough-Ins Complete

25% — plumbing, electrical, HVAC rough-in inspected and approved

Finishing Complete

25% — drywall, paint, flooring, fixtures installed

Final Completion

10–15% — punch list complete, your walkthrough sign-off required

Change Orders

Written approval required before work begins. Never authorize verbally.